4983 Uppsatser om Construction project - Sida 1 av 333

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

Projektledare utan branschkunskap : Varför inte?

Our starting point has been to examine how a project manager without knowledge of the industry is able to plan a project. And also which difficulties that may arise. A qualitative study was conducted at project managers who worked in the construction industry and events industry. Seven interviews were conducted, four in the construction sector and three in the events industry. Respondents are active as project manager in Värmland and Närkes counties.

Byggprojektstyrning med Earned Value Management

AbstractToday, too many Construction projects are delayed and deviates from the budget. Agood project management is the basis for successful Construction project. The mostcommon planning methods in the construction industry is currently Gantt chart andCPM. The problem with these is that focus is only at the time of the project anddoesn?t handle the budget.

Effektivisering av EPC projekt : Fallstudie Johnson Controls

In todays society the demand on companies to deliver better project management is crucial for them to survive. The higher demands from clients make older project management weak and unreliable. In the constructions sector more and more companies are created and the competition is higher than ever. The clients are aware of the higher competition in the construction sector. This has resulted that construction companies must now make their project management more efficient to create better projects and better relationship with clients. The purpose of this thesis arose from this problem in the construction sector.

Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv

This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit. The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes. The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process.

BIM Building Information Model : Hinder & Drivkraft

The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.

Viktiga aspekter i samverkansformen NCC Projektstudio : En intervjustudie för NCC

The projecting time in the construction industry needs to become more efficient toshorten the amount of time it takes to project a build. One of the North's leadingconstruction company NCC constuction Sweden AB has developed a form ofcollaboration called ?NCC project studio? that they use in some projects today.My thesis consists in bringing forth the most important aspects of the collaborationform called NCC project studio. The point of this is to use my thesis to help thecompany develop a quality document that can assist them when starting collaborationbased on NCC project studio in the future.The conclusion of my thesis was that much of the focus needs to be on explaining tothe participants what NCC is aiming to gain from working with the NCC projectstudio and also which important parts that needs to be worked on..

Alternativ motorinkapsling

The problems caused by the current engine casing in aluminum for Volvo Buses Corp. are the mainfoundation for this degree project. Lack of maintenance combined with a construction poorlyadjusted for assembly has resulted in the fact that the engine casings rarely get reassembled whenthe service is completed.The degree project has mainly been following ?Olssons. F, Principkonstruktion, Compendium, Lund?and ?Olssons.

Utfackningsvägg i fältfabrik : en studie av arbetsmiljö och enhetstider

Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market.Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future.This degree project has been performed in cooperation with the construction company Skanska.

Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt

AbstractThe development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in Construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual Construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed Construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine Construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these Construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects.There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted.

Koldioxidutsläpp vid vägbyggnad - en fallstudie med jämförelse av alternativa byggnadssätt

Abstract This degree project examines how much carbon dioxide that emits during the construction phase of a road project. This is to make it possible to compare how the amount of carbon dioxide differentiates between traditional road construction and Swepave construction, which is PEAB?s alternative way to design roads. To make the comparison a calculation tool has been produced. To compare the amount of carbon dioxide emissions a reference project was needed.

Riskhantering i vägprojekt : Effekt, nytta och förbättringar

The aim with this thesis is to study the risk management in Construction projects at the Swedish Road Administration, SRA. Furthermore, the aim is to find the effects of the risk management. The theorem of this thesis is that the positive effects of the risk management in Construction projects create additional value to the project. These additional values are that the project itself becomes resilient and that the project goals are achieved without any significant disturbances.This thesis shows that the risk management in Construction projects do not follow the guidelines set out by the SRA. This is due to a lack of education in the method and a difficult method all together.

Uppkomst av materialspill vid nyproduktion av flerbostadshus

Construction waste from the housing industry includes all unnecessary consumption of building materials. The definition of construction waste is construction materials that has not been built in and becomes waste. Constructions waste can be divided into two types of contributions: operational and work site contribution. Some of the common construction materials in housing industry have such low usage level as 75 % and the rest becomes construction waste. Low usage of construction materials creates unnecessary costs and has a major environmental impact.

 Utvärdering av Revit Architecture :  Med hänsyn till Autocad Architecture

This Degree project summarizes how it is to work in the CAD program Revit Architecture. This was done because AQ Arkitekter in Eskilstuna is interested in how Revit works. Especially compared to AutoCad which is the software they are using today. Will their work become more efficient with the new software?The starting point was to find out how it is to work with Revit when you only used AutoCAD Architecture before.

ANVÄNDNING AV PRODUTIVITETSVERKTYG FÖR ATT NÅ UPPSATTA PROJEKTMÅL : En undersökning på ett Skanska projekt

This is a result of a diploma work in construction engineering. The purpose of this thesis is to investigate the nature of the productivity in a given project and how the Skanska productivity tools were used in this project.Interviews were held among workers and management to get some answers on what affected the work and its productivity. The result of the thesis showed that the productivity tools as propulsion analysis and ?goal cards?, were not used to a wide extent in this project. Furthermore there was almost no feedback for the one who made the calculation and the offer for the project, which might affect the results on projects negatively in the future.Within the project there was a lot of waiting time which affected the productivity.